A PHP Error was encountered

Severity: Warning

Message: fopen(/var/lib/php5/sessions/ci_session1b551dbb87c7eb4e7ff0365f8de7c0bc97854afb): failed to open stream: No space left on device

Filename: drivers/Session_files_driver.php

Line Number: 156

Backtrace:

File: /var/www/tradedeals.biz/cdi/application/libraries/Ion_auth.php
Line: 67
Function: library

File: /var/www/tradedeals.biz/cdi/application/controllers/Product.php
Line: 6
Function: __construct

File: /var/www/tradedeals.biz/index.php
Line: 292
Function: require_once

Iron Ore Crushing Processing Line - Jiaozuo Zhongxin Heavy Industrial Machinery Co.,ltd

Iron Ore Crushing Processing Line

PRICE: contract price
Product Description
Iron Ore Crushing Processing LineIron ore is an important raw material of steel producers. After ore crushing, grinding, magnetic separation, flotation, re-election and other procedures natural minerals (iron ore) elected gradually of iron. Iron in nature all in compounds state, especially in the state of iron oxide but has more impurities. Such as hematite, magnetite, siderite, limonite, etc.In the concentrator, the ore crushing and grinding operations of equipment investment, production costs, power consumption and steel consumption is often the largest proportion, so the calculation of ore crushing management is good or bad, in large determine the economic benefits of the concentrator.To make the Iron Ore Crushing Processing Line, put the 0.5-5 mm iron ore into the hopper, through the vibration feeder , the quantity can be made precise adjustment by hand wheel. By dragging the magnetic roller speed motor, the speed can be adjusted through the governor table, you can control the output and magnetic separator concentrate grade. Mineral particles are fed to the magnetic roller by conveyor to be sort.as iron ore mineral particles has magnetism ,it is immediately adsorbed on the magnetic roller by strong magnetic field, while the gangue grains (miscellaneous stone, sand) has no magnetism (magnetic weak),it does not adsorbed by magnetic roller. Along with the rotation of the magnetic roller, mineral particles has been sucked in the magnetic roller, while the gangue grains is thrown off to in front of the compartment mine board when the magnetic roller to the front end position(by changing the angle of compartment mine board to adjust concentrate mine's grade), mineral particles continue to be taken off the magnetic roller then automatically fall into one volume anthology concentrate ore bucket to collect the finished product.Since the falling of the magnetic roller entrained gangue also has some weaker magnetic mineral particles, they will continue into the next magnetic roller for magnetic separation, magnetic separation of mineral particles into two finished anthology ore bucket to collect the finished Iron Ore Crushing Processing. The gangue was thrown out through tailings discharge port, thus magnetic separation process ends.


Other products

Company Info

Jiaozuo Zhongxin Heavy Industrial Machinery Co.,ltd
Contact Person:
zanManager zan
Phone:
86-371-67660555

0.0464:0.94MB

A PHP Error was encountered

Severity: Warning

Message: rewind() expects parameter 1 to be resource, boolean given

Filename: drivers/Session_files_driver.php

Line Number: 188

Backtrace:

A PHP Error was encountered

Severity: Warning

Message: filesize(): stat failed for /var/lib/php5/sessions/ci_session1b551dbb87c7eb4e7ff0365f8de7c0bc97854afb

Filename: drivers/Session_files_driver.php

Line Number: 192

Backtrace: