Top Hat Roll Forming Machine - Jiangyin Dingbo Technology Co., Ltd Ojo

Top Hat Roll Forming Machine

PRICE: contract price
Company:
Jiangyin Dingbo Technology Co., Ltd Ojo
Contact Person:
Roger Zhang
Phone:
86-510-86952128


Product Description
Working flow: Decoiler--feeding--punching--roll forming--cut to length--output table Equipment list for top hat roll forming machine:      NO.ProductQuant.1Manual decoiler12Main roll forming system(include feeding, transmission, roll forming , hydraulic cutting)13.Out put tables2Main specification of top hat roll forming machine: A. 3ton manual decoiler     1) Capacity: 3ton     2) feeding width: MAX 500mm     3) Valid expanding range for coil inner diameter: 480-520mmB. Main roll forming system of top hat roll forming machine     1) Drive: Chain     2) Main shaft dia: ¢56mm   material: 45﹟forge steel     3) Roller material: Gcr15 bearing steel and quench treatment hardness 55-58, chrome coated     0.05mm     4) Roll station: 13 groups     5) Raw material: 0.5-0.6mm     6) Valid width after fromed: according to drawing     7) Working speed: 10m--15m/min(Exclude cutting time)     8) Length Tolerance: ±2mm     9) Weight of machine: about 3ton     10) Size of machine: About  5500×800×1500mm L x W x H     11) Color of machine: depend on customer     12) Coder: Omron     13) Control: PLC Panasonic, made in Japan. 380V 50HZ     14) Computer operating panel: touching screen     15) Cutting: Hydraulic cutting     16) Auto cutting when reach the set length.     17) Hydraulic power: 3KW     18) Blade material: Cr12,quenched 55°-58°     19) Working pressure:16mpa     20) Cutting tolerance: +/- 1.5mmCharacter of main structure for top hat roll forming machine: Pictures for top hat roll forming machine   Company Testimonial Exhibition After sales service:     1).Engineer will give free training lessons to labors in buyer’s factory.     2).The Buyer will buy the round-trip air ticket for Engineer if visa application is approved.     3).The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 for engineer per day.     4).During this guarantee period, we will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, we will provide the buyer spare parts at cost price.     5).We will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
Other products
12 meters long automatic stacker
Price: contract price
Roof sheet curving machines
Price: contract price
Hydraulic winder
Price: contract price
Floor deck roll forming machine
Price: contract price
Join Free